asce 7 16 components and cladding
Components receive load from cladding. Here are the input and output files associated with these examples: Chapter 30 Part 1: Input File Output PDF File, Chapter 30 Part 4: Input File Output PDF File. Advanced Topics in the Seismic Design of Non-Building Structures & Non-Structural Components to ASCE 7-10 (AWI080213) Score: 70% Dec 2015 . This Table compares results between ASCE 7-10 and ASCE 7-16 based on 140 mph wind speeds in Exposure C using the smallest EWA at 15-foot mean roof height in Zone 2. ASCE 7-16 Update A. Lynn Miller, P.E. Terms and Conditions of Use Designers are encouraged to carefully study the impacts these changes have on their own designs or in their standard design practices. The significance of these changes is the increase in pressures that must be resisted by roof construction elements subject to component and cladding wind loads including but not limited to roof framing and connections, sheathing, and attachment of sheathing to framing. ASCE 7 ONLINE - Individual and Corporate Subscriptions Available A faster, easier way to work with the Standard ASCE 7 Online provides digital access to both ASCE/SEI 7-16 and 7-10 but with enhanced features, including: side-by-side display of the Provisions and Commentary; redlining. Considering all of these effects, a new zoning procedure for low-sloped roofs for buildings with h 60 feet was developed. FORTIFIED Realizes Different Homes have Different Needs . The full-scale tests indicated that the turbulence observed in the wind tunnel studies from the 1970s, that many of the current roof pressure coefficients were based on, was too low. Referring back to Table 30.6-2, it indicates in note 5 that when Fig 30.4-1 applies then we must use the adjustment factor Lambda for building height and exposure. This separation was between thunderstorm and non-thunderstorm events. One new clarification is that the basic design wind speed for the determination of the wind loads on this equipment needs to correspond to the Risk Category of the building or facility to which the equipment provides a necessary service. Sec 2.62 defines the mean roof height as the average of the roof eave height and the height to the highest point on the roof surface, except that, for roof angles less than or equal to 10 deg, the mean roof height is permitted to be taken as the roof eave height. Contact publisher for all permission requests. To meet the requirements of Chapter 1 of the Standard, a new map is added for Risk Category IV buildings and other structures (Figure 3). In ASCE 7-05, o is not specified and load combinations with o are not used with nonstructural components (including penthouses) This calculator is for estimating purposes only & NOT for permit or construction. Access the. A Monoslope roof with a slope between 3 deg and 10 deg follows Fig 30.3-5A. There are also many minor revisions contained within the new provisions. Table 29.1-2 in the ASCE 7-16 [1] outlines the necessary steps to determining the wind loads on a circular tank structure according to the Main Wind Force Resisting System (MWFRS). MWFRS and components and cladding Wind load cases Example - low-rise building - Analytical method Chapter 30 Part 4 was the other method we could use. ASCE 7-16 states that the design of trucks and busses shall be per AASHTO LRFD Bridge Design Specifications without the fatigue dynamic load allowance provisions. The process to calculate wind load in the provisions of the American Society of Civil Engineers Standard (ASCE 7-16, 2016), the National Building Code of Canada [42], the Australian/New Zealand . Wind tunnel tests are used 10 predict the wind loads and responses of a structure, structural components, and cladding to a variety of wind c ditions. The tests showed that the corner zones were too small for the high roof pressures that were being measured at these locations on the building. These changes are: Table 2 illustrates the Zone 2 (20- to 27-degree slope) C&C pressures for ASCE 7-10 compared to the pressures developed in accordance with ASCE 7-16. Wind Loads - Components and Cladding Calculator to ASCE 7-16 Easy to use online Wind Loads - Components and Cladding engineering software for American Standards. Referring to this table for a h = 40 ft and Exposure C, we get a Lambda value of 1.49. The component and cladding pressure coefficients, ( GCp ), for roofs on buildings with an h < 60 feet, have been revised significantly in ASCE 7-16. Examples would be roof deck and metal wall panels. Determining Wind Loads from the ASCE 7-16. Step 6: Determine External Pressure Coefficient (GCp). ICC 500-2020 also requires that floor live loads for tornado shelters be assembly occupancy live loads (e.g., 100 psf in the case of ASCE 7-16) and floor live loads for hurricane . The wind loads for solar panels do not have to be applied simultaneously with the component and cladding wind loads for the roof. For flat roofs, the corner zones changed to an L shape with zone widths based on the mean roof height and an additional edge zone was added. With the simplified procedure of ASCE 7, Section 12.14, the seismic load effect s including overstrength factor in accordance with Section 12.14.3.2 and Chapter 2 of ASCE 7 shall be used. To resist these increased pressures, it is expected that roof designs will incorporate changes such as more fasteners, larger fasteners, closer spacing of fasteners, thicker sheathing, increased framing member size, more closely spaced roof framing, or a change in attachment method (e.g., change smooth shank nails to ring shank nails or screws). Therefore this building is a low rise building. ASCE 7 Main Wind Force Resisting Systemss, MWFRS, Components and Cladding, C&C, wind load pressure calculator for windload solutions. Stringers at elevations 10 m, 6.8 m, and 5.20 m (as shown in Fig. ASCE 7-16 Gable Roof Coefficients 20- to 27-degree slope. Airfield Pavement Condition Assessment - Manual or Automated? Experience STRUCTURE magazine at its best! . The new roof pressure coefficients are based on data from recent wind tunnel tests and then correlated with the results from full-scale tests performed at Texas Tech University. Example of ASCE 7-16 low slope roof component and cladding zoning. Read Article Download. Sketch for loads on the pipe rack for Example 1. The Florida Building Code 2020 (FBC2020) utilizes an Ultimate Design Wind Speed Vult and Normal Design Wind Speed Vasd in lieu of LRFD and ASD. (Note: MecaWind makes this adjustment automatically, you just enter the Width and Length and it will check the 1/3 rule). ASCE 7-16 MINIMUM DESIGN LOADS (2017) ASCE 7-16 MINIMUM DESIGN LOADS (2017) MIGUEL FRANKLIN. Questions or comments regarding this website are encouraged: Contact the webmaster. The program calculates wind, seismic, rain, snow, snow drift and LL reductions. Explain differences in building characteristics and how those differences influence the approach to wind design. An example of these wind pressure increases created by the increase in roof pressure coefficients is illustrated in Table 1. For Wind Direction Parallel To 28m Side Thus, we need to calculate the L/B and h/L: Roof mean height, h = 6.5 mBuilding length, L = 28 mBuilding width, B = 24 mL/B = 0.857h/B = 0.271 Wall Pressure Coefficients, \, and External Pressure, \ Wind load design cases as defined in Figure 27-4-8 of ASCE 7-16 Case 1: Full wind loads in two perpendicular directions considered separately. Reprinting or other use of these materials without express permission of NCSEA is prohibited. Using all of this criteria, we can then determine that the only two methods of Chapter 30 where we meet all criteria are Part 1 and 4 (see chart). Meca has developed the MecaWind software, which can make all of these calculations much easier. The analytical procedure is for all buildings and non-building structures. Enter information below to subscribe to our newsletters. Previously, designers commonly attempted to use a combination of the component and cladding provisions and other provisions in the Standard to determine these loads, often resulting in unconservative designs. 0: 03-02-2023 by Steven Ray : ASCE 7-22,Table 12.2-1 SFRS confusion. As described above, revised roof construction details to accommodate increased roof wind pressures include revised fastener schedules for roof sheathing attachment, revised sheathing thickness requirements, and framing and connection details for overhangs at roof edge zones.. . The ASCE7-16 code utilizes the Strength Design Load also called (LRFD Load Resistance Design Load) method and the Allowable Stress Design Load (ASD) method. Don and Cherylyn explained the significant changes to the wind maps and provisions in ASCE 7-16 including the differences between ASCE 7-10 and 7-16 low-rise components and cladding roof pressures. The concept of wind pressures for building components has been part of the ASCE 7 standard for a number of years, but the changes to the wind load provisions in ASCE 7-16 provide some new methods that could be used by the practitioner for components and cladding design and new wind speed maps change the design wind speed for all structure . Figure 3. Figure 6. The changes include revised wind speed maps, changes in external pressure coefficients for roof components and cladding and the addition of pressure coefficients to use for roof mounted solar arrays. ASCE/SEI 7-10 made the jump from using nominal wind speeds intended for the Allowable Stress Design (ASD) method to ultimate wind speeds intended for the Load and Resistance Factor Design (LRFD) method. The ASCE 7-16 classification types are Open buildings, Partially Open, Partially Enclosed, and Enclosed buildings. It is necessary to look at the impact of the provisions as a whole, instead of individually, to understand how design procedures are affected.. Allows the user to define roof slopes in terms of degrees or as a ratio (x:12) and to input all salient roof dimensions. Click below to see what we've got in our regularly updated calculation library. Key Definitions . ASCE 7 Hazard Tool. There is interest at the ASCE 7 Wind Load Task Committee in studying ways to make these changes simpler and reduce possible confusion in the application of C&C provisions for the ASCE 7-22 cycle. Wind pressures have increased in the hurricane-prone regions where Exposure C is prevalent and wind speeds are greater. Also, a small revision was made to the hurricane wind speeds in the Northeast region of the country based upon updated hurricane models. Printed with permission from ASCE. It engages, enlightens, and empowers structural engineers through interesting, informative, and inspirational content. If we calculate the Component and Cladding wind pressure for an exterior wall of a building located in USA Zip Code 32837, we find the . Note 5 of Figut 30.3-1 indicates that for roof slopes <= 10 Deg that we reduce these values by 10%, and since our roof slope meets this criteria we multiply the figure values by 0.9, Zone 4: GCp = +1.0*0.9 = +0.9 / -1.1*0.9 = -0.99, Zone 5: GCp = +1.0*0.9 = +0.9 / -1.4*0.9 = -1.26. The provisions contained within ASCE 7-10 for determining the wind loads on rooftop equipment on buildings is limited to buildings with a mean roof height h 60 feet. Thus starts the time when practicing engineers learn the new provisions of the Standard and how they apply to their practices. Printed with permission from ASCE. Limitations: Building limitations are described in ASCE/SEI 7-16, Section 30.4 (Low-rise building with certain roof configurations and h 60 ft.) and he has coauthored Significant Changes to the Minimum Design Load Provisions of ASCE 7-16 and authored Significant Changes to the Wind Load Provisions of ASCE 7-10: An Illustrated Guide. ASCE 7-16 defines Components and Cladding (C&C) as: Elements of the building envelope or elements of building appurtances and rooftop structures and equipment that do not qualify as part of the MWFRS (Main Wind Force Resisting System). In simple terms, C&C would be considered as windows, doors, the siding on a house, roofing material, etc.. We will use ASCE 7-16 for this example and the building parameters are as follows: Building Eave Height: EHt = 40 ft [12.2 m], Wind Speed: V = 150 mph [67.1 m/s] (Based upon Category III), Topography: Flat, no topographic features. Comparative C&C negative pressures, 140 mph, 15-foot mean roof height, Exposure C. There are several compensating changes in other wind design parameters that reduce these design pressures in many parts of the country. This software calculates wind loads per ASCE 7 "Minimum Design Loads on Buildings and Other Structures." . Fortunately, there is an easier way to make this conversion. The two design methods used in ASCE-7 are mentioned intentionally. This is considered a Simplified method and is supposed to be easier to calculate by looking up values from tables. Design Project 15 Out-of-Plane Loading: Wind Loading Parapet Design Force (ASCE 7-16) . Analytical procedures provided in Parts 1 through 6, as appropriate, of . Don gave an excellent visual demonstration . Examples and companion online Excel spreadsheets can be used to accurately and eciently calculate wind loads. Major revisions to ASCE 7-16 that affect the wind design of buildings have been highlighted. | Privacy Policy. The designer may elect to use the loads derived from Chapter 30 or those derived by an alternate method.' Apply the ASCE 7 wind provisions to real building types and design scenarios. . Printedwith permission from ASCE. MecaWind can do a lot of the busy work for you, and let you just focus on your inputs and outputs. S0.05 level B2 - ASCE 7 15.7.6 - Calcs B-8 - Please clarify how the tank walls have been designed for . Figure 1. Table 1. Let us know what calculations are important to you. Figure 3. Wind Loads on Rooftop Solar Panels (ASCE 7-16 Sections 29.4.3 and 29.4.4) New provisions for determining wind loads on rooftop solar panels have been added to ASCE 7-16. Reference the updated calculations B pages 7 to 15. They also covered the wind chapter changes between ASCE 7-16 and 7-22 including the tornado provisions. The other determination we need to make is whether this is a low rise building. When calculating C&C pressure, the SMALLER the effective area the HIGHER the wind pressure. MWFRS is defined as " (a)n assemblage of structural elements to provide support and stability for the overall structure." Wind loads on Main Wind Force Resisting Systems (MWFRS) are obtained by using the directional procedure of ASCE 7-16, as the example building is an open building. Example of ASCE 7-16 Risk Category II Basic Wind Speed Map. This limitation was removed in ASCE 7-16, and thus the provisions apply to rooftop equipment on buildings of all heights. See ASCE 7-16 for important details not included here. Join the discussion with civil engineers across the world. Component and cladding (C&C) roof pressures changed significantly in ASCE 7-16, Minimum Design Loads and Associated Criteria for Buildings and Other Structures. Login. Quality: What is it and How do we Achieve it? . The new ASCE 7-16 Minimum Design Loads and Associated Criteria for Buildings and Other Structures (Standard) is adopted into the 2018 International Building Code (IBC) and is now hitting your desks. ASCE 7 -16 Chapter 13 discusses requirements for support of non-structural components such as cable trays.<o:p></o:p><o:p> </o:p> ASCE 7-16, Chapter 13, Item 3.3.1.1 gives some equations for horizontal forces for seismic design for components that include an importance factor. Consequently, wind speeds generally decrease across the country, except along the hurricane coastline from Texas to North Carolina. These calculations can be all be performed using SkyCiv's Wind Load Software for ASCE 7-10, 7-16, EN 1991, NBBC 2015, and AS 1170. Easy to use structural design tools for busy engineers ClearCalcs makes structural calculations easy for a wide range of engineers, architects, and designers across the world. Enclosure Classifications 2. Expert coverage of ASCE 7-16-compliant, wind-resistant engineering methods for safer, sounder low-rise and standard multi-story buildings Using the hands-on information contained in this comprehensive engineering Page 3/14 March, 04 2023 International Building Code Chapter 16 Part 3. Attachments shall be designed to resist the components and cladding loads determined in accordance with the provisions of ASCE 7, . In order to calculate the wind pressures for each zone, we need to know the effective area of the C&C. Simpson Strong-Tie Releases New Fastening Systems Catalog Highlighting Robust, Code-Compliant, and Innovative Product Lines, Simpson Strong-Tie Introduces Next-Generation, Easy-to-Install H1A Hurricane Tie Designed for Increased Resiliency and Higher Allowable Loads Using Fewer Fasteners, Holcim US Advances Sustainability Commitment with Expansion of ECOPactLow-Carbon Concrete, Simpson Strong-Tie Introduces Titen HD Heavy-Duty Mechanically Galvanized Screw Anchor, Code Listed for Exterior Environments. Figure 7. 1: For gable and hip roofs, in addition to the changes in the number of the roof wind pressure zones, the smallest and largest effective wind areas (EWA) have changed. Give back to the civil engineering community: volunteer, mentor, donate and more. Code Search Software. It could be used to hide equipment on the roof and it can also serve as a barrier to provide some protection from a person easily falling off of the roof. ), Design of Lateral Load Resisting Systems in Masonry Buildings, Design of Onsite Wastewater Disposal Systems, Design of Restrained Joints for Pressure Pipes, Design of Roof Structures - Avoiding Common Errors, Design of Sanitary Sewer Collection Systems, Design of Slab on Grade for Light Buildings on Shrink Swell Soils, Designing and Implementing Separated Bikeways, Designing Channels for Stream Restoration: Alluvial Channel Design, Designing Channels for Stream Restoration: Threshold Channel Design, Designing for Flood Loads Using ASCE 7 and ASCE 24, Designing Modern Roundabouts - How to Handle Drainage and Grading, Designing Structures for Tsunami Resilience using the New Chapter 6 of ASCE 7-16, Designing Water Balance Covers (ET Covers) for Landfills and Waste Containment, Designing with AWC's National Design Specification (NDS) for Wood Construction 2018 - Overview and Changes from Previous Editions, Determining Appropriate Level of Engineering and Use of 'Soft Engineering' for Stream Restoration Activities, Developing, Implementing, & Managing a Comprehensive Citywide Traffic Signal Coordination Program, Developing Pavement Performance Models for Asset Management Applications, Diagnosis, Repair, and Restoration of Building Facades, Digitization in the Field of Civil Engineering, Disaster Resilience of Infrastructure Systems: Quantification and Economic Valuation for Decision and Policy Making, Discussion on the new ASCE Manual of Practice on Surveying and Geomatics Engineering, Dynamically Loaded Machine and Equipment Foundations - A Design Primer, Earth Retaining Structures Technical Committee Presentation on Earth Retaining Structures, Effective Pavement Management and Its Benefits, Elimination of Deck Expansion Joints on Existing Bridges, Embankments, Dams and Slopes Technical Committee Presentation on Impacts of Extreme Events on Geotechnical Infrastructure, Embankments, Dams and Slopes Technical Committee Presentation on Impacts of Recent Extreme Events, Energy Piles - Background and Geotechnical Engineering Concepts, Engineer Your Own Success: 7 Key Elements to Creating an Extraordinary Engineering Career, Engineering Investigations of Hurricane Damage: Wind versus Water, Engineering Judgment - Structural Renovation of a 100-Year-old Historic Barn, Engineering Judgment: Low-Rise Building Design and Detailing, Engineering Mid-Rise Buildings of Wood Construction, Engineering Practice for Wetting-Induced Collapse of Soils, Engineering the Future: 2020 Code of Ethics, Engineering Treatments and Design Development Strategies for Creating Safe Routes to Schools, Enterprise Asset Management for Infrastructures, Environmental Issues and Mitigation for Low Volume Roads, Erosion Control and Revegetation Metrails; Design, Installation and Performance, Estimating Erosion Rates - Tools for Prioritizing TMDL-Water Quality Improvements, Stream Restoration, and Infrastructure Protection Projects, Estimating Flood Flows Using Regression Methods, Ethical Behavior - The Key to Earning Trust, Ethics in Sustainable Development for Civil and Structural Engineers, Evaluating Damage and Repairing Metal Plate Connected Wood Trusses, Evaluation and Quantifying Inefficiency in Construction: A Case Study Approach, Failure of Molecules, Bones, and the Earth Itself: Nanotechnology and Bioinspired Materials in Civil Engineering, From Engineering to Entrepreneurship: How to Prepare For, Start and Manage Your Own Engineering firm, From Project Engineer to Project Manager Look Before You Leap, Frost-protected Shallow Foundations - Design and Construction, Geophysical Imaging in Support of Geotechnical, Hydrologic and/or Environmental Site Characterization, Geophysical Imaging in Support of Structural and/or Pavement Investigations, Geo-Structural Investigation of Existing Structures, Geosynthetic Applications Accompanying Shale Gas Drilling Operations, Geosynthetic Basal Reinforcement Over Deep Foundations Including Geosynthetic Encased Stone-Sand Columns, Geosynthetic Clay Liners in Waste Containment Applications - Hydraulic and Chemical Compatibility Performance of GCLs in Landfill Liner Systems, Geosynthetic Clay Liners in Waste Containment Applications - Static Shear Strength of GCLs and GCL Interfaces, Geosynthetic Clay Liners in Waste Containment Applications: Hydraulic and Chemical Compatibility, Geosynthetic Reinforced Mechanically Stabilized Earth Walls, Geosynthetic Reinforced Soil Integrated Bridge System, Geosynthetics Used in Unpaved and Paved Roads, Geotextile Tubes for Erosion Control, Dewatering and Decontamination, Glued Laminated and Cross Laminated Timbers: Mass Timber for a New Generation of Wood Construction, Gray Areas of Responsibility in Masonry Design, Guidelines for Inspecting Earth Dams and Associated Outlet Works and Spillways, Highway and Street Safety On-Demand Webinar Package, How Construction Tolerances Affect Structural Design, How to Meet The Federal Traffic Sign Retroflectivity Requirements, How to Plan Projects Effectively - Two Part Series, How to Prepare and Implement a Successful Strategic Plan, Hydraulic Performance of Detention Pond Outlet Structures, Hydraulics 101 - Understanding the Basics, Hydrologic Trespass and Nuisance Considerations in Stormwater Management Design, Hydrology and Hydraulics On-Demand Webinar Package, Implementation of GIS in the Airport Environments, Improving Highway Safety: An Overview of 9 Proven Crash Countermeasures, Innovation in Civil Engineering: Examples and How to Do It, Innovative and Smart Construction: Use of Infrared Thermal Profiling and GPR Pavement Density Scanner, In-Situ Stabilization of Soil Slopes Using Nailed (or Anchored) Geosynthetics, Inspection and Rehabilitation Methodologies for Large Diameter Water Transmission Pipelines, Installation, Design and Performance of Prefabricated Drains, aka PVDs, Installation, Verification and Application of Driven Piles, Integrity Assessment of Deep Foundations: Principles and Limitations, International Building Code Essentials for Wood Construction - Fire Protection Basics for Structural Engineers, International Project Development and Construction Risk, Introduction to 2015 International Existing Building Code, Introduction to Design of Erosion Control Measures Using Riprap, Introduction to Jet Grouting and Its Applications, Introduction to Navigation Channel Design, Introduction to Runoff Analysis Using Unit Hydrographs, Introduction to Solid Waste Transfer Design for Rural Communities, Introduction to the Design of Wood Lateral-Force Resisting Systems in Accordance with 2015 International Building Code, Introduction to the Seismic Design of Nonbuilding Structures to ASCE 7-10, Introduction to the Seismic Design of Nonbuilding Structures to ASCE 7-16, Introduction to Unsaturated Soil Mechanics, Investigation and Repair of Fire-Damaged Framing, Investigation of Winter Roof Failures - Lessons Learned, Landfills and Waste Containment On-Demand Webinar Package, Large Wood Diaphragms in Heavy-Wall Buildings: New Understandings of their Seismic Behavior and Improving Their Performance, Learning from Failures of Wood-Framed Structures, Lessons From Failures of Building Envelope, Lessons Learned from the Design, Construction and Maintenance of Permeable Pavements for Stormwater Management, Life Cycle Assessment for Transportation Facilities, Long-Term Durability (aka, Lifetime) of Geosynthetics, Low-Volume Road Surface Drainage and Drainage Crossing Structures, Managed Lanes: From Planning through Design to Operations, Management and Leadership Skills for Civil Engineers On-Demand Webinar Package, Marketing 101 - Sleazy Activity or Mutually Beneficial, Mass Timber Structural Floor and Roof Design, Mentoring: Guidance for Mentors, Proteges and Organizations, Mitigating Effects of Corrosion and Deterioration in Construction, Mitigating Uncertainty - A Perspective for Engineers, Mitigation of Carbon Emissions from Construction Projects, Modeling Low Impact Development (LID) and Green Infrastructure (GI) using the EPA Stormwater Management Model (SWMM): Continuous Simulation, Modeling Low Impact Development (LID) and Green Infrastructure (GI) using the EPA Stormwater Management Model (SWMM): Event-based Modeling, Modeling Low Impact Development (LID) and Green Infrastructure (GI) using the EPA Stormwater Management Model (SWMM): SWMM Basics, Moment-Resisting Connections in Steel Structures, Navigation Engineering - Challenges of Sustainability and Resilience, Navigation Engineering - Understanding the Basics, Negotiating Better Engineering and Architectural Contracts, New and Emerging Technology for the Construction of Pavements, New ASCE Standard - Design, Construction and Maintenance of Permeable Interlocking Concrete Pavements, Observation Method For Scour - A New Tool for the Bridge Engineer, Pathogens in Urban Stormwater Systems - A Practical Guide for MS4s, Pathogens in Urban Stormwater Systems - Source Controls and Stormwater Control Measures, Pathogens in Urban Stormwater Systems On-Demand Webinar Package, Permeable Pavement - Design Considerations and Tips for Avoiding Failures, Petrographic Analysis of Concrete Deterioration, Pier and Beam Foundation Design for Wind and Flood Loads, Pipeline Condition Assessment Using Broadband Electromagnetic (BEM) Testing, Planning and Design for Stream Rehabilitation with Large Wood, Post-Tensioning Concepts and Practice - Beyond the Basics, Practical Application of Fiber Reinforced Polymer (FRP) in Strengthening Existing Concrete and Masonry Structures, Practical Concrete Repair and Rehabilitation Techniques for Major Concrete Structures Using ACI 546R-14, Practical Design of Bolted and Welded Steel Connections, Practical Design of Multistory Shear Walls, Practical Insights for Diaphragm Modeling in the Analysis of Building Structures, Practical Life-Cycle Analysis for Bridges, Practical Seismic Evaluation of Existing Buildings Using ASCE 41-13 Tier 1 Screening Procedure with a Case Study, Practical Use of Drones for Diverse Infrastructure Projects, Preparing and Implementing Construction Site Storm Water Pollution Prevention Plans, Prevent Accidents and Traffic Delays - The Art of Delivering and Maintaining Successful Signal Timing Improvements, Professional Skills Series in Leadership and Management: Career Development, Professional Skills Series in Leadership and Management: Change & Innovation, Professional Skills Series in Leadership and Management: Communication, Professional Skills Series in Leadership and Management: Leadership, Professional Skills Series in Leadership and Management: Project Management, Project Planning: How to Think Through Before You DO, Project Planning On-Demand Webinar Package, Project Team and People Management - Part I of II, Project Team and People Management - Part II of II, Public Speaking - How to Plan, Design, and Deliver a Presentation, Quality Management during Design and Construction.